Temporary Road Construction Underway on Damaged BP Highway
Bhaktapur: Following the flood and landslide caused by the Roshi River on October 4 and 5, work has resumed on the temporary road diversion along the damaged BP Highway. As the water flow in the Roshi River subsided after the